<%@LANGUAGE="VBSCRIPT" CODEPAGE="936"%> How to install jaw crusher
  HOME ABOUT US NEWS & INFO PRODUCTS SPARE PARTS INTERNATIONAL TRADE HONORS AFTER-SALES SERVICE CONTACT  
  From 1983,VIPEAK supplies what you require from stone crushing
machinery, sand making machinery, and grinding mill worldwide.
NEWS
  News & Info
  Product Knowledge
Honors
Environmental Certificate CE Certificate
Three stages description of stone crushing Home - News & Info  

How to install jaw crusher

Jaw Crusher is mostly put in on top of the concrete foundation. Given the load of a bigger crusher, poor operating conditions, and therefore the machine in operation once more with nice force of inertia to market the muse and therefore the machine phylogenetic vibration. primarily based on vibration are directly caused by alternative machinery and equipment and building structures vibration. Therefore, the idea of crusher should be separated with the plant base.
Meanwhile, so as to scale back vibration, when the equipment is putting in, the cushioning material that isn't thinner than 10mm of rubber belt ought to be crammed up between crusher and concrete foundation and tighten the anchor bolts when the fastness cement of second bonded tendons. Meanwhile, the amountness ought to be admeasured with the level instrument, of that the deviation is a smaller amount than 2mm of the width in front of the frame front wall of importance. can|this could|this may} certify that the crusher will have the circumstance of unilateral feeding attributable to the deflecting, that shield the equipment from uneven masses.
If you bought the Vipeak company's jaw crusher, vipeak are skilled jaw crusher installation engineers perform installation for you, so as to permit your have a convenient useing of jaw crusher.http://www.crushertrade.com/

Copyright???2008 by?Vipeak Mining & Construction Machinery Co., Ltd. All rights reserved stone crusher Tel:?08058472222?/?08033970366 Email:?nigeria@vipeakgroup.com